Pilot-Scale Acid Mist Scrubber Tower
PriceOn request — the first reply carries a budget band and a lead time, within one business day
Lexin-tech is professional customized China Pilot-Scale Acid Mist Scrubber Tower manufacturers,supplier and factory, specialized in providing customized Pilot-Scale Acid Mist Scrubber Tower in stock with wholesale price. For quotation, contact us now.
- Built to order
Engineered against your feed assay and throughput - Bench & pilot tested
Sample testing before the flowsheet is frozen - Export documented
Pre-tested, skid-mounted, documented for customs - EN / ES / RU / AR
Technical support in four languages
Lexin-tech is professional customized China Pilot-Scale Acid Mist Scrubber Tower manufacturers,supplier and factory, specialized in providing customized Pilot-Scale Acid Mist Scrubber Tower in stock with wholesale price. For quotation, contact us now.
Specifications
| Tower Material | FRP filament-wound shell with PP/PVDF internal fittings; suitable for H2SO4 and HCl mist, not for HF-containing gas |
|---|---|
| Tower Size | DN300 x 2000 mm column, packed bed height 800 mm (other diameters on request) |
| Column Internals | PP pall rings 25 mm packing with support grid, mist eliminator pad at top outlet |
| Gas Flow Rate | 100-500 Nm3/h design range (to be confirmed by test work) |
| Recirculation System | 100 L PP tank with corrosion-resistant centrifugal pump, 1.5 m3/h at 15 m head |
| Scrubbing Liquid | Water or dilute NaOH 1-5% recirculated; automatic pH-controlled caustic dosing optional |
| Pressure Drop | 800-1500 Pa across packed bed (to be confirmed by test work) |
| Removal Efficiency | Over 95% for acid mist droplets larger than 3 microns (to be confirmed by test work) |
| Connections | PN10 flanged gas inlet and outlet, DN50 liquid make-up and blowdown connections |
| Frame and Controls | 304 stainless steel support frame, differential pressure gauge, pump on-off control box; 380 V / 50 Hz |
Values are the documented specifications for this model. Final dimensions are confirmed on the approved drawing before production.






